FANDOM


Apollo11EagleNotebookPg068
<Brief page summary to go here.>

Grumman Aircraft Engineering Corporation

LOG

Page No 68

Engineer

DOWSE / SARBELLO

Project

LM-5

Location

ACE 3

Time

DAY

Title

Date

8/20/68
  1. IT WAS DETERMINED THIS MORNING BY DON DIMARTINO THAT THE RETEST OF THE NEW "-7 LCA" WILL BE PERFORMED AFTER PANEL #2 HAS BEEN REPAIRED.
  2. SET UP THERMAL COUPLES TO MONITOR ASCENT ECA'S TEMPERATURE. (THE GLYCOL LOOPS ARE DOWN.) TEMPERATURE IS NOT TO EXCEED 115° F.
  3. CONFIGURING TO RUN PORTIONS OF OCP 62000 EPS ON TBR #3 CONTINUATION SHEET IN ORDER TO SELL TDR'S #3, 4, 5 & 6.
(a) THE DESCENT STAGE IS DEMATED.
(b) CONNECT BOB (MAY ALREADY BE CONNECTED) TO J174 OF ASCENT STAGE TO MONITOR THE FOLLOWING POINTS IN PARALLEL WITH THE MODIFIED J167 BOB (LSK 560-1126-3-5) & THE MODIFIED J166 BOB (LSK 560-1113-7) (+) J POINTS AND (-) Z POINTS, INSTEAD OFF THE CDR POS & NEG AND THE SE POS & NEG POINTS;
J174 PIN 239 - TO PNL 11 NEG VIA THE X-LUNAR BUS
J174 PIN 240 - TO PNL 11 POS VIA 4 CB 10 DES ECA CB
J173 PIN 109 - TO PNL 16 NEG VIA THE X-LUNAR BUS
J173 PIN 108 - TO PNL 16 POS VIA 4 CB 11 DES ECA CB
PICK PORTIONS OF THE OCP AND INTER LEAVE READINGS OF THESE POINTS BY MEANS OF THE TDR CONTINUATION SHEETS.