Grumman Aircraft Engineering Corporation

LOG

Page No 73112

Engineer

A. H. / E. H.

Project

LM-5

Location

HCE 3

Time

Day Shift (contd)

Title

-

Date

8-13-68

(4) We reviewed data summary (in note book) & question results: "What is common between Bat 6 NF and Bat 6 BU which results in 3.75 to 5.4 mΩ greater res than res of Bat 5 NF & 5 BU lines?"

Can loose Return connections at bat 6 studs be responsible?

This should be looked into if window is available. Suggest measm'ts before & after tightening.



Engineer

S. SARBELLO

Project

Location

Time

NIGHT SHIFT

Title

Date

8/13-14/68


1. WROTE STEPS REQUIRED TO TIGHTEN BATTERY #5 & #6 WITH EPS POWER IN SUPPORTING MODE. WAITING TO GO ON LINE. INSTRUMENTATION REPAIRING OPEN CIRCUIT (CONNECTOR P186B PIN 14).

2. SUPPORTING 063 ON OCP 61015

3. INSTRUMENTATION REPAIRED CONNECTOR - CRT PAGE 4 LINE 10 (GC0302) OK. INSTR. COMPLETED WORK AT 0430.

4. 053 CAUSED SCRUB OF BATTERY #5 & #6 STUD TIGHTENING ACTIVITY - NO TIE IN DURING SHIFT CHANGE OF INFO AND GATHERED EQUIPMENT & HARDWARE.

5. LTG GROUP TROUBLESHOOTING ALL NIGHT ON TDR #32.

Post-it note on page:

Exce...[illegible], these pages, of Ross Fleissig & J. K...[illegible]: "Batteries were a black art."