FANDOM


Apollo11EagleNotebookPg061
<Brief page summary to go here.>

Grumman Aircraft Engineering Corporation

LOG

Page No 73111

Engineer

S. SARBELLO

Project

LM-5

Location

PLT 5

Time

NIGHT SHIFT

Title

Date

8/12-13/68

1. RECONNECTED P/J 105 & P/J 87 ON TDR #3 SHEET 37.

2. RECONFIGURED ALL CB'S TO CLOSE POSITION THAT WERE CLOSED LAST FRIDAY NIGHT (8/9-10/68) IN SUPPORT OF INSTRUMENTATION TESTING (SEE TDR #3 SHEET #38).

3. CRT, CABIN VOLTMETER AND CAUTION/WARNING LIGHT "DC BUS" SHOW SYSTEM ENGINEERS' BUS OFF. A CHECK AT GPS STATION (S. E. POS) AND AT 1113 BOB SHOW DC ON S. E. BUS. PROBLEM LOOKS LIKE AN OPEN CIRCUIT IN THE INSTRUMENTATION AREA.

4. EPS SUPPORTING COMMUINCATIONS & INSTRUMENTATION TESTING. LIGHTING GROUP TO GO ON LINE AT 0400.

5. LIGHTING GROUP RAN SEQ. 075 AND PICKED UP TDR #32. LTG THEN CHECKED OUT TEMPORARILY INSTALLED DOCKING LIGHTS USING TDR #31 CONTINUATION SHEETS. DOCKING LIGHTS CHECKED OK.

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

Engineer

A. HECHT / E. HOMBURGER

Project

Location

Time:

DAY SHIFT

Title

Date

8/13/68

(1) AT TURNOVER MTG:

ROSS FLEISSIG REQUESTED TO FIND OUT DETAILS OF WHEN DOCKING LTS CHECK W LCA (DEVIATED OUT OF 62000) WILL BE DONE. APPARENTLY, DOCK'G LTS WILL NOT BE INSTALLED IN OCP 61015.

(2) Reply: Docking LTS have been TEMPORARILY installed, and will be checked in 61015 as such.

(3) Found Bat 5 & 6 Negative leads loose at Bat 5 & 6 Dummy Bat Studs. Also loose at Current Mon # 5 & 6. S/B tightened when veh. is powered down. (61015 prep has crab about this which req's selling).

over please.

☜ Previous page (60) index Next page (62)