Grumman Aircraft Engineering Corporation LOG Page No 73081 Engineer E.DOWSE/S.SARBELLO Project LM 5 Location PLT 5 Time 7:48AM-8:10PM Title Date 7/11/68 1. WITNESSED PIT TEST (TOTAL 4.5 HRS) ON GENERAL PURPOSE INVERTER S/N 128 . TEST CONDUCTED BY JIM LAMPRECHT . DEPT 063 OPERATOR OF GPI TEST STATION WAS CHARLIE FARMER . COPY OF TEST DATA TO BE FORWARDED TO S. SARBELLO AT LATER DATE. 2. TRANSFERED INSTRUMENTATION PROBLEM INCURRED IN EPS TDR#2 TO INSTR. TDR^#16 AND ATTEMPTING TO SELL OFF TDR#2 TO NASA. 3. SOLD TDR#2. ___________________________________________________________________________ E.HOMBURGER — NIGHT SHIFT — 7/11,12/68 1. Performed Continuation sheet#5 for TDR3— checked PVM-DVM2 readings against Fluke meter at Battery studs. 2. Stood by as EPH for FCS OCP 3. get Controller Control Panel (Power supply for CPOCRC ) repaired now? ___________________________________________________________________________ E.DOWSE - DAY SHIFT 7/12/68 1. THE CONTROLLER REPAIR PEOPLE ARE OBTAINING ALL NECESSARY REPAUR PARTS AND WHEN THESE ITEMS ARE GATHERED WE WILL THEN GIVE THEM A WINDOW TO WORK ON THE UNIT. THE CONTROLLER IT NOT TO LEAVE THE WORK STAND. 2. ___________________________________________________________________________ E.HOMBURGER — NIGHT SHIFT — 7/12,13/68 1. LM6 Panel 5 ready at 0515 ,but no window now for changing panels because ECS is using C&W lights 2. R/R OCP got TDR for no PFI light at CDR X-PNTR 3. got Nasa to sign off the Batt Readout Test Set Pin F change to the IPC. |