Page 32

                  Grumman Aircraft Engineering Corporation

                               LOG                         Page No 73081

Engineer E.DOWSE/S.SARBELLO        Project     LM 5       Location PLT 5   

Time 7:48AM-8:10PM                 Title                  Date 7/11/68     

1. WITNESSED PIT TEST (TOTAL 4.5 HRS) ON GENERAL
   PURPOSE INVERTER S/N 128 . TEST CONDUCTED BY
   JIM LAMPRECHT . DEPT 063 OPERATOR OF GPI TEST
   STATION WAS CHARLIE FARMER . COPY OF TEST DATA
   TO BE FORWARDED TO S. SARBELLO AT LATER DATE.

2. TRANSFERED INSTRUMENTATION PROBLEM INCURRED
   IN EPS TDR#2 TO INSTR. TDR^#16 AND ATTEMPTING
   TO SELL OFF TDR#2 TO NASA.

3. SOLD TDR#2.
___________________________________________________________________________
E.HOMBURGER  NIGHT SHIFT  7/11,12/68

1. Performed Continuation sheet#5 for TDR3
       checked PVM-DVM2 readings against
       Fluke meter at Battery studs.

2. Stood by as EPH for FCS OCP

3. get Controller Control Panel (Power supply for
       CPOCRC ) repaired now?

___________________________________________________________________________
E.DOWSE - DAY SHIFT   7/12/68

   1. THE CONTROLLER REPAIR PEOPLE ARE OBTAINING
   ALL NECESSARY REPAUR PARTS AND WHEN THESE ITEMS
   ARE GATHERED WE WILL THEN GIVE THEM A WINDOW
   TO WORK ON THE UNIT. THE CONTROLLER IT NOT TO LEAVE
   THE WORK STAND.
   2.
___________________________________________________________________________
E.HOMBURGER  NIGHT SHIFT  7/12,13/68
   1. LM6 Panel 5 ready at 0515 ,but no window now
       for changing panels because ECS is using C&W lights
   2. R/R OCP got TDR for no PFI light at CDR X-PNTR
   3. got Nasa to sign off the Batt Readout Test Set Pin F
          change to the IPC.